

Review of system layout and design intent
Identification of commissioning sets, DRVs and binder points
Confirmation of access for accurate measurement
We connect into the system via binder points using DRVs and commissioning sets.
Using a hydronic manometer, we:
Measure live flow rates across circuits
Set terminal units to design duty
Balance the system to achieve correct distribution
Our reports are built around measured data, not assumptions. We provide:
Verified flow rates against design requirements
Evidence of blocked strainers and filters
Identification of pump performance issues
Indications of incorrect pipe sizing or distribution problems
Systems operating to design intent
Balanced flow across all circuits
Reduced energy consumption
Improved BMS control and stability
Lower plant stress and maintenance costs
Consistent internal conditions
You also have documented proof of performance.

If a system is not properly commissioned, inefficiency becomes part of normal operation.
Hydronic balancing and flow rate commissioning correct this without the need for system replacement.




Commercial hydronic specialists
Proven measurement methods using hydronic manometers
CIBSE-aligned approach
Clear, reportable outcomes
